SUbscriber Login | NEW SUBSCRIPTION  

Grambling works to fix water woes

  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
in

GRAMBLING — The Town of Grambling is one test away from having its three-well water system back and operating at two-thirds after crews worked during September and early October to get the town’s latest problematic well, well No. 5, back in operation.

With one of the town’s three water wells, well No. 4, out of commission since July, Grambling’s water system took another blow Aug. 24 when it also lost well No. 5, leaving the town and its residents at the mercy of one working well.

Full text of this article is available to subscribers only. Login if you are already a subscriber. If you are not a subscriber, you can subscribe to the online version here.

Bookmark and Share