SUbscriber Login | NEW SUBSCRIPTION  

Renovations on La. Tech’s Memorial Gym nearly done

  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
in

After renovation initially started on July 30 to replace the original floor that came with the Memorial Gymnasium facility in the 1950s, the new state-of-the-art floor is less than two weeks away from final completion.

The classic look of the floor was designed to permanently honor former Louisiana Tech basketball coaching legend Robert “Scotty” Robertson — an eight-time Hall of Famer — and will serve as an alternate practice facility for the Bulldog and Lady Techsters basketball teams as well as for use by the health and physical education department.

Full text of this article is available to subscribers only. Login if you are already a subscriber. If you are not a subscriber, you can subscribe to the online version here.

Bookmark and Share