SUbscriber Login | NEW SUBSCRIPTION  

Revamping Choudrant

  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
in
Village may begin sidewalk project this year
010813 Choudrant Bridge C.jpg
Leader photo by ELIZABETH DEGRIE Pictured is Choudrant’s bridge, which is currently not connected to anything, but will be linked to sidewalks when the revitalization project is completed.

If all goes as Mayor Bill Sanderson would hope, the Village of Choudrant should be much more pedestrian-friendly and aesthetically-pleasing by the time residents ring in 2014.
Sanderson said the village has been working since 2006 on a revitalization project, similar to the one Ruston has been doing for the past few years.

Riley Company, a local engineering consultancy firm, recently submitted the design for the project to the Louisiana Department of Transportation and Development.

Full text of this article is available to subscribers only. Login if you are already a subscriber. If you are not a subscriber, you can subscribe to the online version here.

Bookmark and Share