SUbscriber Login | NEW SUBSCRIPTION  

Intramural center construction progresses

  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
in
122810 intramural1 C.jpg
Additions to the Maxie Lambright Intramural Center will include an outdoor recreation pool and indoor lap pool, as well as a rock wall, food services and an upstairs outlook room.

After breaking ground more than six months ago, the additions to the Louisiana Tech Maxie Lambright Intramural Center are under way with the completion date in sight.

Full text of this article is available to subscribers only. Login if you are already a subscriber. If you are not a subscriber, you can subscribe to the online version here.

Bookmark and Share