SUbscriber Login | NEW SUBSCRIPTION  

Tech plans for construction

  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.

After Phase I, which is scheduled to be complete fall 2009, Speed said Phase II would begin along Everett Street.

The two new dorm complexes should house more than 480 students.
“The first part will be another University Park,” Speed said, referring to Tech’s newest housing along Alabama Avenue.

“Unlike University Park, these units will be full apartments with washers and dryers and full-size kitchens. University Park doesn’t have that; they’re more of utility apartments.”

The Everett Street dorms, Speed added, would be a “hybrid between all.”

Full text of this article is available to subscribers only. Login if you are already a subscriber. If you are not a subscriber, you can subscribe to the online version here.

Bookmark and Share