SUbscriber Login | NEW SUBSCRIPTION  

BIDS: TIGER DRIVE

  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.

SEALED PROPOSALS FOR:
TIGER DRIVE DRAINAGE will be received by the LINCOLN PARISH SCHOOL BOARD, Ruston, Louisiana, in the Board Meeting Room of the Lincoln Parish School Board office, 410 South Farmerville Street, Ruston, Louisiana, until 2:00 P.M., local time, on Thursday, April 28, 2016.
No proposals will be received after this hour or date. On this date and specified time, bids will be publicly opened and read aloud.
PROJECT: Tiger Drive Drainage
PROJECT CLASSIFICATION: Highway, Streets, and Bridges
CONTRACT TIME: 67 Calendar Days
LIQUIDATED DAMAGES: $500.00
Complete sets of drawings, specifications, and forms may be obtained at the office of RILEY COMPANY OF LOUISIANA, INC., 112 East Mississippi Avenue, P.O. Drawer 1303, Ruston, Louisiana 71273-1303, Telephone (318) 251-0238, Fax (318) 251-0239. Cost per contract set is $75.00. Any unsuccessful bidder, upon returning such set within ten days of bid opening and in good condition, will be refunded the deposit and any non-bidder upon so returning such set within ten days of bid opening will be refunded $10.00.
Please find bid related materials and place your electronic bids at www.centralbidding.com
Each proposal is to be accompanied by a certified check payable to the LINCOLN PARISH SCHOOL BOARD or a bid bond, the amount of either of which shall be five percent (5%) of the amount of the bid. Bidders are advised that both a Performance Bond and a Payment Bond, each in the amount of 100 percent (100%) of the Contract Price, will be required. No Bidder may withdraw his bid within thirty (30) days after the actual date of the opening thereof.
Types of construction required for this project include dirtwork, drainage structures, base course, asphaltic concrete and concrete.
The LINCOLN PARISH SCHOOL BOARD reserves the right to reject any or all proposals for just cause.
LINCOLN PARISH SCHOOL BOARD
Mike Milstead, Superintendent of Schools
3td: March 28, April 4, 11, 2016

Bookmark and Share