SUbscriber Login | NEW SUBSCRIPTION  

Draw down of Lake D’Arbonne underway

  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
in
draw.jpg

FARMERVILLE — Just after 9 a.m. Tuesday, the first of four siren blasts were sounded, signaling the opening of control structures at Lake D’Arbonne’s T.T. Fields Memorial Spillway.
When the final minute-long blast came at 9:30, gates were opened to begin the draw down of the lake.

Conducted every four years, the draw down allows property owners on the lake’s shore to make repairs to docks, seawalls and other structures.

Full text of this article is available to subscribers only. Login if you are already a subscriber. If you are not a subscriber, you can subscribe to the online version here.

Bookmark and Share